Sale of apartments in modern new construction with a pool, near Fažana!

  • Code : 09137
  • Location : Fažana
  • Building size : 115.31 m2
  • Distance from center : 3500 m
  • Distance from sea : 1300 m

449.809 €

Number of views : 540

FEATURES

  • Floor : 1
  • Number of floors : 3
  • Number of bedrooms : 3
  • Number of rooms : 3
  • Number of bathrooms : 2
  • Parking : Yes
  • Air conditioning : Yes
  • Energy efficiency : A+
  • Year of construction : 2026

DESCRIPTION

New on the market!
We offer modern apartments in a new building with a swimming pool, located within an attractive project consisting of four buildings with a total of 23 apartments of various sizes and layouts. The project is situated in an excellent location – a peaceful environment near the sea and all essential amenities.

Apartment D4, with an area of 115.31 m2, is located on the 1st floor of building C, which has 3 floors.
The apartment consists of an entrance hallway, a wardrobe, a living room with a kitchen and dining area, 3 bedrooms, 2 bathrooms, and a terrace (9.07 m2).

Equipment and standards:
- Underfloor heating in the bathrooms.
- High-quality ceramic tiles.
- PVC windows of French type with shutters and mosquito nets.
- Bathroom fixtures from renowned manufacturers.
- Air conditioning unit.
- Anti-burglary entrance door.
- Option to choose the final flooring – ceramic tiles, parquet, or laminate in the bedrooms.

2 parking spaces included in the price.
Each building will have its own secured vehicle access via a remote-controlled gate, and the rear part of the building, i.e., the parking lot, will be monitored by video surveillance 24/7, ensuring maximum privacy regarding entry and exit, as well as the security of vehicles in the parking lot.

The swimming pool measures 5.70m x 14.90m, or 85m2, making it the largest pool in the residential complex in the area. Along the entire length of the pool, there will be a sunbathing area with loungers and lounge furniture. Additionally, a "cabin" by the pool is planned, which will be of a modular type, equipped with a summer kitchen, barbecue, and a large dining table for communal gatherings. The pool, as well as all equipment and amenities, will be exclusively for residents' use.

The planned start of construction is March 2026, with completion expected in September 2027.

We are accepting reservations.

For more information, please

:

All data on these websites are presented for information purposes only, before any conclusion or activity based on data from these pages, all information must be checked in our agency.

CONTACT US

Selling a property?